Image may be NSFW.
Clik here to view.
Come learn about the much-anticipated cycletrack on M Street NW at our “Walk the Tracks” event next Mon., May 6 at 6:30 p.m. WABA staff, members, and supporters will walk the length of project, starting at Thomas Circle, and discuss the proposed bike lane. Staff from DDOT and the Golden Triangle and Downtown BIDs will be present. This event is a chance to have your questions answered about the project, its design, and the timeline for its construction.
The proposed one-way westbound cycletrack will extend from Thomas Circle at 14th Street NW to 28th Street NW in Georgetown. The cycletrack will be 1.3 miles in length. Last fall, DDOT constructed a one-way eastbound cycletrack on L Street NW. When complete, the L Street and M Street cycletracks will be parallel routes that establish a major east-west crosstown corridor for bikes—and add to the growing network of physically separated Green Lane Projects in our city.
The event will start at 6:30 p.m. at the Capital Bikeshare station on the west side of Thomas Circle. We will walk 1.3 miles west along M Street NW, ending in Georgetown. After the walk, those interested in enjoying a cold drink can do so at a local Georgetown business. If you are planning on attending our “Walk the Tracks” event, please RSVP here.